Frequently asked questions
Useful answers before the work is fully defined.
These answers explain the public service model. A proposal, contract, plans, specifications, permits, and current qualification documents control an individual project.

Getting started
Project and procurement questions.
Send the project location, requested service, quantities or limits known, desired schedule, site photos, drawings or specifications, and bid instructions. REMI may request a site visit or additional records before defining scope or price.
The live site states National Service, and the October 2022 capability statement lists work in multiple states. Geography, mobilization, registrations, licensing, schedule, and capacity are confirmed project by project.
The website and October 2022 capability statement list federal 8(a), Minnesota TGB, training, identifiers, and endorsements. Status can change; request current evidence and verify it in the appropriate registry before relying on it.
REMI publishes federal, municipal, industrial, transportation, and maintenance past performance. Send the solicitation, due date, scope, location, qualification requirements, and the teaming role under consideration.
By service
Questions tied to the work.
Use these answers to prepare a stronger first inquiry, then confirm every project-specific requirement in writing.
Selective to complete removal
Demolition
The public site lists residential structures, outbuildings, concrete and hardscape, pools, storm cleanup, construction sites, and small-to-medium commercial buildings. Industrial or public work is reviewed against the actual scope.
REMI publishes debris removal and haul-away capability, but the accepted proposal should define materials, quantities, disposal requirements, and the final site condition.
No. The dated statement lists Asbestos Awareness training and hazardous-material driving endorsements; it does not establish an abatement license or guarantee availability. Regulated work must be verified and contracted appropriately.
Groundwork and civil support
Excavation & Site Preparation
Yes, both applications are presented on the live site. Capacity, geography, equipment, schedule, and the specific scope still require confirmation.
Grading, backfill, ditching, drainage, and erosion control appear in published capability materials. Engineering and design responsibilities must be established for the individual project.
Send the location, project type, available plans, desired dates, known site conditions, material quantities, and bid or procurement requirements.
Grounds and paved-surface care
Landscape & Lot Maintenance
The live site presents year-round service. Current route availability, property type, service frequency, and seasonal scope need confirmation.
They are listed in the October 2022 capability statement. Confirm current geography, equipment, response terms, and capacity before relying on that dated listing.
Potentially. Send the site plan, service areas, desired frequency, condition standards, and any procurement requirements so REMI can assess fit.
Hauling and logistics
Trucking & Transport
Equipment and construction-material transport are consistent with the company’s published logistics scope. Send dimensions, weight, origin, destination, loading method, and timing for fit review.
The live site mentions OTR freight and the 2022 statement lists long-term hauling. The requested lane, authority, equipment, schedule, and current capacity must be confirmed.
The 2022 statement lists hazardous-material and tanker endorsements. That does not mean every commodity or movement is accepted; all current regulatory and project requirements must be verified.
Southwest Florida specialty work
Pool Cage & Exterior Services
The live source labels these services Florida-only and the linked specialty site focuses on Englewood and surrounding Southwest Florida areas. Confirm the exact property and current service radius.
Both are presented on the live source. The team should inspect or review the proposed project before confirming scope, products, engineering, and schedule.
Ask for the contracting entity, qualifier, license number, insurance certificates, and permit responsibility, then verify the license through the applicable official Florida registry.
A question about your project?
Put the actual scope in front of the team.
Share the site, requested outcome, dates, and documents available so REMI can respond in context.